October 2012


Standing in the building site looking north as I left it in August


Looking west where the temporary power is at approximately the floor level of the living area


Looking South East from the West side approximately even with the temporary power


Looking North after excavating down approximately 8' and moving 10 ' West


Shows the footings being poured.  Progress!!!!